Vifluter Low-Temperature Evaporation & Crystallization Case

Customer

Honghe Arsenic Industry (Yunnan Tin Group related business)

Core solution

LTZQ-750 + TA2 - low-temperature evaporation/crystallization for waste reduction and crystallization drying

I. Company & Project Overview

Customer industry: arsenic (As)-based new materials production and R&D. The wastewater is high-arsenic, high-salinity organic wastewater.

Project objective: reduce wastewater volume, enable crystallization/drying, and facilitate downstream hazardous-waste treatment; the referenced downstream disposal cost is approximately RMB 2,100/t.

II. Wastewater Profile

Wastewater

Mixed production wastewater (alkaline integrated wastewater + acidic wastewater from centrifuge dewatering)

Flow

Approx. 10 t/day

Main components

Organics, arsenic, Na+, Cl-, SO4(2-), F-, etc.

COD

40-70 g/L

Arsenic (As)

20-38 g/L

Sodium salts

90-115 g/L

Chloride

<100 mg/L

pH

7-8

Operation

Designed for 24-hour continuous operation

III. Original Treatment & Key Pain Points

Original treatment: single-vessel evaporation + MVR; a ZQ unit was positioned downstream, while the original single-vessel process had been stopped.

Existing situation

Pain point

Business / operational impact

Own 1.5 t boiler

Relatively high steam dependence

Steam cost approx. RMB 360/t

Electricity approx. RMB 0.5/kWh

Energy efficiency needs improvement

Low-temperature solution offers potential for energy optimization

High As, high salinity and COD

Pressure on volume reduction and crystallization/drying

High downstream hazardous-waste disposal cost

Reuse required

Reuse must be validated by actual distillate quality

Cannot rely on theoretical indicators alone


△ Original process / discussion flow diagram (based on customer communication materials)


IV. Vifluter Solution

Solution direction: for high-arsenic, high-salinity and high-COD wastewater, apply low-temperature evaporation and crystallization for volume reduction and crystallization/drying, with actual distillate quality used as the basis for reuse validation.

Equipment

LTZQ-750, TA2

Pilot validation

LTVR-25 pilot test; customer feedback: good performance and low salt in distillate

Operation

24-hour operation design

Key consideration

Altitude effect; vacuum/negative pressure 70-85 (unit not specified in source material)

Core objective

Wastewater reduction + crystallization/drying + downstream hazardous-waste treatment

V. Before & After

Available project information confirms that the LTVR-25 pilot test performed well and produced low-salt distillate; project discussions subsequently identified LTZQ-750 and TA2 as the applicable equipment.

Indicator

Original treatment

Vifluter solution

Process

Single-vessel + MVR; ZQ downstream

Low-temperature evaporation & crystallization

Pilot

-

LTVR-25; good performance, low-salt distillate

Flow

Approx. 10 t/day

Designed for 24 h operation

Equipment

Original single-vessel stopped

LTZQ-750, TA2

Reuse

Further treatment/validation needed

Based on actual distillate indicators



△ Customer-provided wastewater data and project communication notes


VI. Customer Feedback & Economic Impact

Customer feedback: the LTVR-25 pilot test showed "good performance and low salt in the distillate," according to the project communication record.

Economic impact: key project parameters include electricity at approximately RMB 0.5/kWh, steam at approximately RMB 360/t, and downstream hazardous-waste disposal at approximately RMB 2,100/t. The available materials do not provide a complete operating cost per ton, annual savings, or payback period, so these figures are not estimated here.

VII. Sales & Project Progress Highlights

·Clear customer needs: volume reduction, crystallization/drying, downstream hazardous-waste treatment, and distillate reuse.

·Technical validation: LTVR-25 pilot test completed with positive feedback and low-salt distillate.

·Solution alignment: project communication identified LTZQ-750 and TA2.

·Current stage: awarded / won the bid -> agreement under discussion/signing.

Source Note

This case is compiled strictly from customer communication screenshots and the "Water Business Unit Classic Case Template". Information not provided is marked "Not provided" or annotated with explanatory text; no missing economic data, implementation schedule, or payment terms have been fabricated.